ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE

SFO- 4174
(3-50)

A.

ALT

JOB NO,

DRAWING NUMBERS AND DATES:

170-612

729 = 15

(1/27/51

CONTRACT NO.
For:

2

oe

ce

a
Construc tioa

"Property

LESCRIPTION OF

PROPERTY UNITS

i

Quantity

et

Unit

Contract
Cust

46

10 February 1951

ESTIMATE
i

tst'd. Value
vov. Furnished
Material

fo + —— —-4-

Engineering
Cost

"Proration of
Mharqes to Units

wee

eee

| MOBL REQUIRED CONSTRUCTION AND LOCATION OF THE FOLLOWING STATIONS:
GUAGE MOUNTS, STATIONS 27a, b, c, 4M d, SITE "C*
Hole in ground,

x 6'~) 1/2" deep,

Steel tubes aet in conorete to form a square block 2'-6" z 2'-6"

Cubic content, 30 plus cubic feet, Anchorage and hardware,

4

Each
Direct
Indirect

$6,761, 30
2,599,417

$364.73

2,360.19
2,472 ,12

99,93

$9,725.50

GUANE MOUNTS, STATIONS 27a, b, 0, AND d, SITE "E*
|

Bole in ground,

x 6t-] 1/2® deep,

Steel tubes set in concrete to forms a square bloak 2'-~6" x 2'-6%

Cubic content, 30 plus cubic feet,

Anchorage and hardware,

4

Each
Direct
Indireot

OF

for use by A-E

DATE OF THIS REPORT:

Gauges Mounta

Stations 27a, b, o and a

No.:

SHEET NO

"Not

LOCATION EMI WETOK ATOLL

AT={ 29-11-5907

The Complete Construction of
Building

Account
Number

(oa...

COMPLETION REPORT FOR

Thre

the Ny
tranan
ww any

4,932.24

CAUTI

Select target paragraph3