ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE

SFO-.436
13.30)

COMPLETION REPORT FOR
JOB NO. 640 - ju

AS-BUILT DRAWING NUMBERS ANDO DATES:

FS-630

CONTRACT NG.
F or:

5/7/51

SHEET NO.

S SS

AT+l 29-1 |-507

LOCATION

1

OF,

29

“Not for use by A-E

JAPTAN ISLAND = SITE *L®

The € C omp lete
tion of C oncrete
te Slabe 8 foror Tent
ete Const
nstruction
ents

DATE OF THIS REPORT:
7 May 1951

Building No.: 67, 68, 69, 70, 72, and 73
ESTIMATE

.

Property

DESCRIPTION OF PROPERTY UNITS

Account

Quantity

.

Unit

Construction
Contract

Number

Est'd. Value
Gov. furnished

Engi
i
noineetog

Total

4

OONCRETE SLABS FOR TENTS

Slabs No. 67, 68, 72, and 73:
complete with anchor bolts.

Slabs Mo. 69 and 70:
anchor bolts.

A 4" concrete slab, size 15'-10" x 31'-10",

4k" concrete slab, size ly'=4" x 1h'-6", complete with

b

Each

2

Each

Direct
Indirec

$333.47
311.59

$645.06

*pCharges tocunits

Select target paragraph3