Ma

ATOMIC

— SANTA

SFO. 43

AS-BUILT DRAWING NUMBERS AND DATES:
FEn69,
ooh

JOB NO.

COMMISSION

PERATIONS OFFICE
0

COMPLETION REPORT FOR

For:

ee
LOCATION

CONTRACT NO, 29-1

729 = 32

4/2/52

FE

ENERGY

;

SHEET NO.
Not

32

for use

by

OF
AE

DATE OF THIS REPORT:
2 April 1951
¥

ENTWETOK aTOLL

The Compiete Construction of Hole in Ground with Concrete Fill

Pr

%

,
€

Building No.: Station Nos, 6101, 6102, 6103, 6104 and 6105
ESTtMATE
«

Property

DESCRIPTION OF PROPERTY UNITS

Account

.

Quantity

.

Unit

Construction

Contract

Est'd.

Value

.

Gov.Furnished

Engineerin

oe 8

*Prorati
f
Charges to Units

Total

4.C,C, REQUIRED CONSTRUCTION AND LOCATIGN OF THE FOLLOWING STATIONS:
HOLE IN GROUND WITH CONCRETE FILL, STATICH NOS, 6101 THRU 6104 ON SITE "E*
Square holes in the ground, aise 3'-0" x 3'-0" x 3'-0" deep with 4" concrete footing
in hole, Holes to be filled with concrete when instruments are installed by user,

4

Each
Direct
Indirect

$623.76
707 91

$904

$1,340.71

155,92
176,97

2,26

335,15

HOLE IN GROUMD WITH CONCRETE FILL, STATICN WO, 6105 OM SITE *S*
Square holes in the ground, sise 3'-0" x 3'-O0"8 x 3'-0" deep with 4" concrete footing
in hole,

Holes to be filled with concrete when instromenta are inatalled by user,

1

Each

Direct
Indirect

a

ee,

;

eet

“This decum@t cont
pformation affecting
the Natena |
ferPeGine United States [ta
transmineses
the dG
a of ite enntents

in eny new

prohibited edi

te an @ufthorieed peron ie
may Sede

in severe criminal

Select target paragraph3