ATOMIC ENERGY COMMISSION
, SANTA FE OPERATIONS OFFICE

skO. 44 u
(3.605

AOL

EMT TG

JE-5660, 4

[tea NEIMHt He

4/2/51

AM

god no.

. Otto

729 = 27

Pon bw ACT
or:

| *.rope rty
|

*

NG, ATbeet bud

The tomplete

tCunstrue tian

Building Na.:

|

SHEET NO | 3 OOF

COMPLETION REPORT FOR

of

Lut AT [ai

KIRTIGN OF

PROPERTY UNITS

Not

for

b ATE

(tr

use by

A-E

THIS RERGKT:

2 April 1951

Hemisphere Location

Stationa 518, 5171, 519, 5141, 5151 and 516)

homo thay »

ott

Ate uowet

ENIWETOK ATOLL

Vuantity

Laat

Contract

Number

Lest

petta.
Mati,

‘diue

Material

-

.

Engineer cen
Cust

turns whe

.
Proratton

‘harges

af

toa Units

4

OCSO AND ESL REQUIRED CONSTRUCTION ANT) LOCATION ON THE FOLLOWING STATIONS:
HEMISPHERE LOCATION, STATION 518 and 517) OW SITE *S*
Round hole in the ground, size 4'-O" diameter x 4'-0" deep,
by user and installed by Holmes & MNarver,

Equipment furnished

2

Each
Direct
Indirect

i

P

1

5

$2.76

$229.06

1,38

114,52

3,58

297 67

wT

Round hole in the ground, aise 4'-O" diameter x 4'-O" deep,
by user and installed by Holmes & Narver,

Equipment furnished

1

Each
Direct
Indirect

49,34
63,80

HEMISPHERE LOCATION, STATIONS 5141, 5152 and 516) ON SITE "KE"
Round hole in the fround, sise 4'-O" diameter x 4'-0" deep,
by user and installed by Holmes 4 Narver,

Equipment furnished

3

Each
Direct
Indirect

128,25

165 84

peter yet Perea
hee daa es

neath
ae

ower

the

cee begte

Dt

cn Te
hauled

fuera) Leawe ”

Select target paragraph3