ATOMIC ENERGY COMMISSION
qxSANTA FE OPERATIONS OFFICE

550. #0

Ch

COMPLETION RFPORT FOR

Ay-BUIL! GRAWING NUMBERS &Ni (ATL:
oreo

aaa

100-259e3

3/28/51

100=259=4

730.3 = Or

CONTRACT NUL —AT-1 )-507_
for:

(LOCATION

WMUZIN ISLAND - SITE *S®

3,3,8h

—

sueet no 18 og 18 |
Nut

for

use

by

A-t

DATEL OF THIS REPORT:
28 March 1951

The Lomplete Construction of Air Pores Structure Type C-1,1
Huilding Now:

3/28/51

|
Ireroperty
Accuunt
|

JOH NO.

.

‘

E =

CST EMATE

cgrstitionPortavatve PP
ET
Gk SCRIPTION OF PROPERTY UNITS
Quantity
Yn t
pore t
poe Fare nes
“Cost
Total
Charges to unite

|

| STRUCTURE 3,3,8b
|
|

4 reinforced concrete, brick and steel structure, three section, size 30'-2" x 59'8° wide, ends open, side walle of concrete brick, metal window frames ami sash

|

erected on 5" x 5'-O" depth foundation walle, atructural ateel roof trusses support—

|

wooed sheath deck and three skylight monitors, aides metal frames and sash, ends
covered with corrugated metal, One side wall has structural steel wing wall exten-

|

|

ed by structural steel columns on concrete piers, 1 ply roof covering over 1/2"

sions at each end, sise 10?-2 1/2" long x 9'-9 1/2" high, the total height of tbe

structure above grade is 13'-0", the covered area is 1,790 square feet,

i

Rach

Direct

Indirect)

$49,047, 30
26,920,43

~O-

$75,967.73

Instrumentation

Direct
Indirect!

28,631, 86
27,057 ,06

$11,088_93

66,777 .85

Total Structure and Instrumentation

Direct
Indirect;

TT ,679 16
53,977.49

12,088,93

142,745.58

|
'

CAUTION
OPP deeret
vine Netti. bh
tiatiedinasser o

=

,

.

«

(he red Pusat er

pede Ptee ane

gerne
Woe
wee linet)
os bee

soe ow

Wed Stes bus
Payee cons te
Teefopmee

ois

Neete or rigid

Select target paragraph3