ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE

SFO. 43 0
(3. 50)

AS-BUILT

Se

COMPLETION REPORT FOR
DRAWING NUMBERS AND DATES:

100-253-1

JOB NO. 730.3 - 9q

3/20/51

CONTRACT NO.
For:

AT-{ 29-1 )-507

LOCATION

Tne Complete Construction of
Building

No.:

SHEET

WO

13 a

or 38.

“Not for use by A-E
DATE OF THIS REPORT:
26 Maroh 1951

MUZIW ISLAND - SITE *g*

gir. Porce Structure Type P-2

3ede5d

ESTIMATE
seropen,T .

ee

Account

|

GESCRIPTION OF PROPERTY UNITS

7
Quantity

“T const ruc tion
Unit

Number

Contract
Cost

—
Est'd.

Gov.

Value

Furnisneal

Materiai

.

.

Frgi neering

Cost

Total

BUILD ING BO. 3.3 .5d
A two story brick building, gable roof sheet metal covered, erected on concrete

foundation walle 1'-) 1fe x 5°-1" deep, sise 34°-0" x 421-9", interior brick

walle sapported by 1'-0" oonerete foundation walle, five interior brick masonry
fire places, 3" bitumal oconarete on sand support sleepera for tongue and groove
flooring of the first floor, sand between second floor joist and ceiling joist,
metal lath od plaster covered walls and partitions except entrance and stair
halle, sonorete extrance slab, the outside dimensions of each floor ig )2'-1" x
335'-" giving a total floor area of 2000 square feet, 10'-6" ceilings give «
subio sontent of 29,100 eublo feet.

1

each
Direct

Indirect

Instrumentation
Tota] Structure and Instrumentation

$53,525.

1, Tle 79

Direct

6,

Indireat

5,

Direct

Indirect

3?
TT.

& ,023.53

53, 389.93

-0-

$101,238.39

$527 .27

12,702.34

527.27

113,910.73

"Proration of
Charges to Unit

Select target paragraph3