trBibice ATOMIC ENERGY COMMISSION SANTA FE OPERATIONS OFFICE SFO. 434 (3.50) AS-BUILT DRAWING NUMBERS AND DATES: 100=252- 3/28/51 100=252-2 100-252=3 3/28/51 3/28/51 100-262-1 3/28/51 100=252-4, sweet W0..2O COMPLETION REPORT FOR Jo8 NO, 730.3 - 9o For: TT The Complete Construction of . ; = or 18 *Not for use by A-E DATE OF THIS REPORT: LOCATION MUZIN ISLAND - SITE "S" 28 March 19 air Force Structure Type C-1.) 2.3—3 ESTIMATE Quantity DESCRIPTION OF PROPERTY UNITS Account AT-1 29-4 1-507 Bullding Now: 3/28/51 “Property CONTRACT NO, — Unit Construction Contract Est'd. Value * Gove erp i shed Engineering * Proratj ' Chargesfonto oO units Cost Totai ~O- $371,665 06 BUILDING A reinforced concrete, brick and steel structure, three section, sise 0,D, 120'-28" long x 236'-8" wide, ends open, side walls of brick and concrete blocks, meta) window frames and sash, erected on 1'% 1/2" x 5'-4" depth foundation walls, structural steel roof trusses supported by structural stes] columms on concrete pisrs, built up roof over 2" plank deck and three skylight monitors, sides metal frames and sash and ends covered with corrugated metal, One side wall has structural eteel wing wel) extensions at each end, sise 40'-6 1/2" long x 38'-6" high, the total height of the structure above grade is 52'-4", the covered area is 28,798 aquare feet, 1 Rach Direct $216,674.17 Each Costs inoladed in Instrumentation Indirect Piers for Displacement Gages (Dwg, 100-262-1), 154,790,89 A reinforeed concrete atructure with a foundation footing 7'-0" x 9'-6" x 2'-0" thick and « pyramid of a rectang- uley oross section rising 25'-0" above the footing, total mass 11,4 cubio yards, Location to be shown on site plan, Instrumentation Total Structure and Instrusentation Miscellancous Materials Furnished to Air Force 6 Direot Indirect Direct Indirect Direct Indireat 40,875.21 38,087 ,29 $9,614.61 88,577 11 257, 749,38 192,878,18 9,614.61 460, 242,17 4,373 34 2,617, 63 & -0- , 6,990,97 teh 5 : obs | oS ong I.