ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE

SFO-43 4

‘3. 50)

aAS-BuilT ORAWING NUMBERS AND DATES:

461361
481361

2/6/51

2/6/51

CONTRACT NO.

JOB NO. 729-9]

730.2—9m

For:

The Complete Construction of
Bui Iding

oe
“Property

No.:

Quantity

DESCRIPTION OF PROPERTY UNITS

Number

STRUCTURE

oor__8

DATE OF THIS REPORT:

6 February 1951

SITE "S*

MUZIM -

Navy Type Structure

3.2.78 and 3-2-7b

-

Account

9

“Not for ue by A-E

LOCATION BEMGEBI - SITE *E*

AT-( 29-1 }-507

/

SHEET NO

wf

COMPLETION REPORT FOR

—
ESTIMATE
nn
—
.
Est'd, Value
Const ruc tion
Unit

Contract

Cost

Gov.

Furnished|

Material

7

oe
ee

Engineering

Cost

Total

3.2.

A reinforced concrete test structure, sise 0.D. 21'-0" x 41'-0" x 11'-6" above

grade, with 12" floor and foundation footings 3'-0" below grade, one end wall
opening with metal door.

i

each
Direct

Instrumentation

1, 156.96

Direct
Indirect

4,931.06
4,912.76

-O-

$18,891.91

2,264.69

12,108.53

12,669.7h

2, 264.69

31, 000.hh

Direct
Indirect

$19,279.67
12, 626.9)

-O-

31,906.61

Instrumentation

Direct
Indirect

4,i2h.h9
4,020.52

2,136.02

10, 261.02

Total Structure and Instrumentation

Direct
Indirect}

23,408.16
16,647.46

2,136.01

42,187.63

Total Structure and Instrumentation

STRUCTURE

$11,134.93

Indirect

Direct

Indirect

16,066.01

3.2.

A reinforced concrete test structure, size 0.D. 21'-0" x h1'-0" x 11'-6" above
grede, with 12° Moor and foundation footings 3'-0" below grade, ons end wall

opening with metal door.

1

each

“fae

.

a
|

Proration af

narges ta Units

Select target paragraph3