@

SFO. 430
(3.50)

AS-BUILT

ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE

5‘ are,

COMPLETION REPORT FOR
JOB NO. 730.2 - 9g

DRAWING NUMBERS AND DATES:

2/6/51

481351

481352
481353

For:

2/6/51

2/6/51

481354

a

Account

DESCRIPTION OF PROPERTY UNITS

Number

The Complete Construction of Mavy

°

.

”

PT

Quantity

Unit

§

DATE OF THIS REPORT:

6 February 1951

Type Structure

ESTIMATE
Construction

Cont ract
Cost

Est'd.

Value

Gov. Furnished}
Material

-

.

Eogineering
Cost

Total

3.2.3
Concrete and steel test atructures of prefabricated oe1] panels and trusses for
walle and roof, welded, grouted and anchored to fonndation foctings and floor

slab,

Sise of the structures 0,D, 21'-7 5/8" x 41'-7 3/8" x 10'-9 1/4" high,

Building Wo, 3,2,34 - Structure

2

Rach
Direct
Indirect

$35,248 27
10,210, 58

-0-

$45 45885

4,527.85

$2 ,066,79

11,145.78

Direst
Indirect

39,779, 41
14,738 43

2 ,066,79

56,604 63

Direct
Indirect

35,813.55
11,236, 33

-0-

47,049 ,88

Instrumentation

Direct
Indirect

5,616 44
5 263,85

3,086 34

13,966 63

Total Structure and Instrumentation

Direct
Indirect

41,429.99
16,500, 18

3,086, 34

61,016,512

Instrumentation

Total Structure and Instrosentation
Building No, 3,2,3 ~- Structure

Direct

Indirect

4,531.14

CA
*Thre hecumient 5
the Nottomar dis

Seuae-+

or_j8_

"Not for use by A-E

LOCATION ENGEBI ISLAND - SITE "E*®

AT~( 29-1 }-507

Building No.: 3.2.3 8 apd b

2/6/51

"prope rty |

CONTRACT NO.

SHEET NO.

Foatieyer bt

.

;

Cporation of

arges to Units

Select target paragraph3