.

5FO. 43 a

(3. 50)

4623k5

h813h6

4068 NG. T39@e29e & d

ele

CONTRACT NO.
For:

AT-(29-1)-507

LOCATION

The Complete Construction of

2/6/51

3

of28

“Not for use by A-E

EMGEBT —- SITE *E*

DATE OF THIS REPORT:

6 February 1951

Mavwy Type Structure

Building No.: 3-202 8 and b

2/6/52

ESTIMATE

"Property
DESCRIPTION OF PROPERTY UNITS

Account

sHeer wo

Saerrt

COMPLETION REPORT FOR

AS-BUILT DRAWING NUMBERS AND DATES:
on

ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE

Quantity

Unit

1

each

Construction
Contract

Est'd. Value
Gov. furai shed

oo

Engi
;
ng Leet. ng

Total

BUILD]BG 3e2-)s

A reiaforoed soncrete test structure and foundation, sise 0.D, 28'-0" x 26!-0*x

1i'-0" with an enclosed hollow section 22'-0" x 22'-0* x 6'-0" — 212 cubio yards

of eonerete and steel, foundation located 6'-0" below grade.

Direct
Indirect

$29, 202.33
19,656.61,

Instrumectation

Dir ect

263.99

Total Structure and Instrmentation

Direct

29,486.32

-O-+

$48,858 .97

BOILING 3.2-1b
& reinforced concrete test structure sise 0.D, 281-08 x 26'-0" x 10'-6" above

grade and foundation 6'-0" below grade is made up of 203 precast cells,

etructarel steel supported and layer imbedded, walled in, and roofed over with
reinforced concrete. The totel cubic content of structure 0.D. is 305 cubic

yards.

1

each
Direct

Indirect;

Instrumentation
Total Structure and Instrumentation

Direct

Lb, 857.11

25,535.83

-0-

264.18

10,3929

Tadirect

195 099

253.80

713.97

Direct
Indirect

45,121.29
25,731.82

253.60

71,106.91

CA

te Pot
queers,

.

Thin das umeni s

fom
4 cae

.

ppb

"4

*Drorati
Charges to bart ;

Select target paragraph3