ATOMIC ENERGY COMMISSION

TIONS OFFIC E
SANTA FE OPERATIO
FOR
REPORT
COMPLETION
JOB NO. 640 - Ta

AS-BUullLT DRAWING NUMBERS AND DATES:

CONTRACT NO,

For:

AT-( 29-1 )~507

oo.

;

SY

a
88oraT

“Not for use by A-E

LOCATION BOGALLUA ISLAND - SITE "F*

BATE OF THIS REPORT:

The Complete Construction of Site Preparation, Engineering Design, &
Building No.:

Preliminary Work
ESTIMATE

DESCRIPTION OF PROPERTY UNITS

Quantity

unit

Construction

Contract

Estid.

Value

OOMteeta

Engineering

Cost

Total

Fiald Sketches #77 and #83 may be used as reference far the preliminary wrk and

materials which have been reported as follows:

(1)

Blade & Shape

(2)

Control & Signal Cable

(3)

Pier

(4)

Air Strip Matting 50' x 900'

(5S)

Breakwater

(6)

Channel

(7)

Commnication System including

240,000 sqe ft.

78,750 lineal feet
20 foot
5,000 sq. ft.
1,300 feet

Direct
Indirect

$1,097.36
1,194.17

$23.91

$2,715-b4

Indirect

1,118.3

431.3h

5,888.12

33.60

1,055.05

412.56

17 9395093

31.07

1,716.3

$20.54

$20.54

$651.56

$651.56

$1,190.63

$2,190.63

Direct

Direct
Indirect

743278
277-67

Direct
Indirect
Direct
Indirect!

12,939.56
4,043.81
738 42
946.87

Direct

19,149.53

Direct

Submarine Cable

yy 338.35

415.58

Considerable preliminary work was involved however, original plans were never
completed and no As-Built drawings are submitted. The survey department

reports that due to shifting sande and attempts to control same being unsucceseful
the project waa abamioned.

The following are features which were not constructed but to which design
charges are applicable:
200 foot

tower

Water Facilities

Electrical Facilities

“This document,

ae T

*

&@

the Nutional |

irprsminshin

a
inal! es

*Proration of

Charges to Units

Select target paragraph3