SFO. 430

- @

ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE

sucet no

22

or27

(3. 90)

COMPLETION REPORT FOR

AS-BUILT ORAWING NUMBERS AND DATES:

1OL-519 11/15/50
11/15/50

10L-520

JOB NO.

640 — Jo

. 5/7/51 - Revised

CONTRACT NO,
For:

Saip@aetT

AT-(29-1)-507_

The Complete Construction of

"Not for use by A-E

LOCATION JAPTAN ISLAND ~- SITE *"L*"

DATE OF THIS REPORT:

15 Nowember 1950

Sewer System

Revised:

Building No.:

7 May 1951

ESTIMATE
"pr

*

Account.
Number

DESCRIPTION OF PROPERTY UNITS
+

Quantity

Unit

-

Construction

Contract
Cost

Est'd.

Value

Gov. Furnished
Material

.

.

Engineering

Total

*p

.

Charges to Unite

a

PIPING SYSTEM, OUTDOOR - Sanitary Sewer

Pipe 8" Corrugated Metal, Outfall - 300 Lin. ft.

Pipe 8” Vitrified Clay - Mains ~ 1,060 Lin. ft.

Pipe 6" Vitrified Clay - Branches - 2,090 Lin. ft.
Drop Inlete - 6" Y Service Connections - 36 each
Drop Inlets - 4" Y Service Connectiona - 7 sach
Drop Iniets - 3" Y Serwice Connections - 1 each
Drop Inlets - 2° Y Service Connections - 4 each

Services, Sewer and Cleancut - 50 each

Manholes — Size - 28" diameter, Kind -— C.H.P., Cover - Cl -- 15 each

1

System

Direct

Indirect

$20,751.33

16, 3b 05

$1,487.81

$38,583.19

rian. affecting
Varanasi

ed States Thea

teocontenta

1RaADN Moun

hed person 14

prohigited

vere cnmrinal

Select target paragraph3