a

SFO.43 0
(3. 80}

ATOMIC ENERGY COMMISSION
SANTA FE ‘OPERATIONS OFFICE
COMPLETION REPORT FOR

AS-BUILT DRAWING NUMBERS AND DATES:

2L-020 12/15/50
2L-489

12/15/50

2L-986 12/15/50

2L-987 12/15/50

21-988 12/15/50

21-990

JOB NO. 640 - 3f

12/15/50

FS~4.72 shh1/51

“Property
Account

CONTRACT NO,
For:

SHEET NO.

Bullding No.:

Revised:
7 May 1952

ESTIMATE

Unit

Constructlon
Contract

Cost

Est'd.
Gov.

Value

Furnished

Materiai

Engl neering
Cast

Total

LABORATORY BUILDDIG
Qne story, double roof, prefabricated aluginus construction; rectangular shape}
consists of two parallel buildings joined by 6'-10" covered passage; each building

24'-O" x 72'=8 1/2" x 12'-08 I.D.3; anohor bolted to a 5" thiek concrete slab, size
0.D. 56-0" x 73'=10 1/2"; shed type sheet aluminum roof over passage provides
longitudinal gutter between buildings; vented window panels screened; saluzinum

pertitions separating 11 rooms; doors at each end of passageway; with lignting
and power wiring and fixtures; plumbing; telephone installations dehumidification
equipment; dark room sealed for humidity control; leboratories are equipped with
wooden shelves, benches, and countersj linoleum and plyglase covered benches

include 12 stainless steel sinks; sleb area 0.D. 4,135 square feet; cubis content
inoluding passageway 38,500 cubic feet.

Direct
Indirect

$47,911.23
32,912.60

or_J

DATE OF THIS REPORT:
15 December 1950

12

Quantity

8

*Not for use by A-E

LOCATION JAPTAM ISLAND - SITE "L"

Tne Complete Construction of Laboratory Building

DESCRIPTION OF PROPERTY UNITS

Number

AT~( 29-1 }-507

See

$779 43

$81,603.26

CA
“This document
phe Nationat Lets,

*Proration of

Charges to Units

Select target paragraph3