ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE
COMPLETION REPORT FOR

AS-BUILT ORAWING NUMBERS ANDO DATES:

21-963

12/23/50
12/23/50
12/23/50

12/23/50
12/23/50
12/23/50

12/23/50

12/23/50

12/23/50
*Property

JOB WO.

640 - 3m

CONTRACT NO.
For:

LOCATION

AT-( 29~1 )-507

SHEET MO.

Bullding No.:

12/23/50

1

Zi.

DATE OF THIS REPORT:

23 December 195)

11
ESTIMATE

Quantity

Unlt

Construction

Est'd. Value

Contract
Cost

Gov. Furnl shed
Material

Engineering
Cost

Total

POWER AMD WATER DISTILIATION PLANT
Qne story concrete and prefabricated aluaimm construction; double roof)

rectangular shape; sise I.D. 24'-O" x 55'=-2 1/2" x 17'-3"3 set on a 6" reinforced
concrete slab, with drain facilities, pipe tunnels, pipe trenches and covers;
reinforced concrete equipment foumtiations; standard alusinus wall panels set on

slab and above S'-3" high reinforced concrete walls in a 17'-5" portion of the

buildings vented window panels; eliding doors; piping systems; with electric

wiring and fixtures, power wiring and control services; floor area 0.D. 1,119
square feet; cubic content 1.D. 15,L45 cubic feet.
Outaide Building -—- Diesel o11 and gasoline tank stand of wood, Douglas fir,
5'-0" x 7'=-0" x 5'~8", cormer posts, sills and beams 12" x 12", diagonal bracing 1° x12". Platform, 11'O8 x 7'-0" with 1° x 12" flooring, supporting two tanks,

steel, welded, sise 5'-O" x 7'-O0" x 5'-O". Fuel oi] tank, 100 gallon, aylinder
steel.

Installed equipment includes:

-_ OF.

"Not for use by A-E

JAPTAN ISLAND - SITE “L"

The Complete Construction of Power and Water Distillation Plant

DESCRIPTION OF PROPERTY UNITS

Account
Number

Sduit

Two generator units, four distillation units,

three pump units, cubloles, piping and control equipment.

Costs for these items

are not recorded on this eheet, but may be found in Power and Water Facilities
Reports.

Direct
Indirect

$1,024.61,

$50, 383.78

“Proration of
Charges to Units