ATOMIC ENERGY COMMISSION
4. SANTA FE OPERATIONS OFFICE

SFO- 430
¢3- 80}

COMPLETION REPORT FOR

AS-@BUILT DRAWING NUMBERS ANO DATES:
18 H-626

JOB NO.

640 = 3q

12/19/50

CONTRACT NO,
For:

sent

LOCATION

AT-( 29-1 1-507

sweet wo.6 OF

JAPTAN ISLAND - SITE "L"

DATE OF THIS REPORT:

19 December! 1950

The Complete Construction of Timber Grease Raok
Buliding

No.:

2

“Not for use by A-E

93

ESTIMATE
"Property

A

DESCRIPTION OF PROPERTY UNITS

Huober

Quantity

Unit

Construction

Contract
Cost

Estid.

Value

Gov. Furnished
Material

Engineeri

ering

Cost

Total

"Prorati
9
ono f

Charges to Units

TIMBER GREASE RACK

One grease rack of timber construction; overall sise at grade level 1)'-0" x

42'-9 3/h"; two tread ramps rising from concrete pads to elevated planking 5'-5*
above grade; tread ramps and elevated planking 2'-0" wide, 3'-3" between struc-

tures, constructed of 3" x 8" planking; ramp length 20'-6", horisontal elevated

planking 22'-3 3/4" in length; 2" x 6° planking floor on sills between rasp and
elevated structures; floor area 89 square feet; Douglas fir timber supports,
bracing, and planking above 6" x 8" redwood sills set on grade.

1

Each

Direct

Indirect

$2,191.58

2,613.98

$5,105.56

CAUTION
“Thin docu
che Nathoral
Tro AN Tt
tansy mas
) Pohabited

penalties u

TURIN inte

Select target paragraph3