ATOMIC ENERGY COMMISSION SANTA FE OPERATIONS OFFICE $FG.434 (3. $0) AS-BuUILT DRAWING NUMBERS 8B-53k2 6/5/51 6E=-5343 6/5/51 88-S3kk 6/5/51 pa SR. COMPLETION REPORT FOR AND DATES: JOB NO, 8B-53K7 6/5 85-53e8 CONTRACT 129 - uw For: 6/5/51 Account Number mn Now: -—ee Construction Quantity Contract fost Est'd. Gov. Value | Furnished Material : ; Engineering Cost Total QOAKIAL CABLE SYSTEM, SITE *E/" Bouxial cable system includes survey for and installation of cables, trenching, and backfill, and treaoh stations. Following figures are approxiaste. Trench Cable nu 5 dune 1951 Coaxial Cable Syste EsTIMATE DESCRIPTION OF PROPERTY UNITS OF “Not for use by A-E DATE OF THIS REPORT: LOCATION ENGSBI ISLAND - SITE "Ef* AT-( 29-11-50? The Complete Construction of Build ing dE-5345 6/5/51 85-5346 6/5/51 “Property NO. SHEET WO. 1h,29S Lin. Fee 573,765 Lime Fte Direot $85,285.49 79 621.643 $339 68 $165,246.60 | *Proration of Charges to Units