ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE

$FG.434

(3. $0)

AS-BuUILT

DRAWING

NUMBERS

8B-53k2 6/5/51

6E=-5343

6/5/51

88-S3kk 6/5/51

pa

SR.

COMPLETION REPORT FOR
AND

DATES:

JOB

NO,

8B-53K7 6/5

85-53e8

CONTRACT

129 - uw

For:

6/5/51

Account
Number

mn

Now:

-—ee

Construction
Quantity

Contract

fost

Est'd.
Gov.

Value |

Furnished

Material

:

;

Engineering

Cost

Total

QOAKIAL CABLE SYSTEM, SITE *E/"
Bouxial cable system includes survey for and installation of cables, trenching,
and backfill, and treaoh stations.

Following figures are approxiaste.

Trench
Cable

nu

5 dune 1951

Coaxial Cable Syste

EsTIMATE

DESCRIPTION OF PROPERTY UNITS

OF

“Not for use by A-E
DATE OF THIS REPORT:

LOCATION ENGSBI ISLAND - SITE "Ef*

AT-( 29-11-50?

The Complete Construction of
Build ing

dE-5345 6/5/51
85-5346 6/5/51

“Property

NO.

SHEET WO.

1h,29S Lin. Fee
573,765 Lime Fte
Direot

$85,285.49

79 621.643

$339 68

$165,246.60

|
*Proration of

Charges to Units

Select target paragraph3