ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE
COMPLETION REPORT FOR

- 6L0 - Be *

en...

overt No
for

Ge Bea

[ATION BMGEBI ISLAND - SITE Bf
1

ch

Ef Areas, Buildings, md Facilities

||:

tld

I
wale

royre ya

Material

yt ted

“t A

or

Qh

be

is|

ebRORT.

dh duly 1951

not covered by detailed Ae-tuilt drawings.
t

LB
aot

ry

t Rap btiere roy

moet

fey

.

|

uta

t

brutatuan at
Charges ta: tinit

|

WATER FaCILItTiRs

|

Coneisting of « 100 barrel steel invasion type tank, two 16,000 gallon horisontal
preeumtio compressor type tanke, two 120 CFM compressors rehabilitated or
installed with necessary valves, regulators, end piping salvaged from previous
instal lation

|

1

$ 23,934.48
1 klh.92

|
||

£127.21

@ 25,476.61

9,626.49
6,133.0

47o22

15,807.01

5, 78h.02
4,001.89

27015

9,813 266

10.76

5,329 018

BLECTRICAL FACILITIES
Rehabilitation of existing electrical services, erection of poles and tranamizsion
lines, and the re-installation of lighting, telemetering, and motor-generator sets.

1

TELEPHONE FACILITIES
Rehabilitated and service re-established, including cable.

i

RADIO AMD PUBLIC ADDRESS SYSTEM

|
|

Rehabilitated and reconnected for service.

1
2, WO0eT1
2,91 7071

rat to ath ing
read sea
*
tite ie

1 em
eocre

imeuak

yet) ows”

oath

Select target paragraph3