ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE

$FO.430
(3.50)

AS-BUILT DRAWING NUMBERS AND DATES:

JOB NO.

yon = there

5R-5691 - 5/16/

“Pro

SHEET No.

COMPLETION REPORT FOR

t

Account”
Number

729 -

CONTRACT
For;

NO,

DATE OF THIS REPORT:

18 May 1961 ©

Temex Collimateor

Building No.: Stations &, 94

Quantity

Unit

ESTIMATE
Construction|

Contract
Cast

Est'd.

Value

Gov. Furnished
Material

ee

.

,

Engineering
os

Total

listed are indicated by the following:

oubio yards
qubie yards
1

e#ach
Direct

Indirect
Station 9

1

$6,387.86

3,277.7h

$29.80

$9,695.10

2.45

7,423.88

each

Direct

Indi rect

$4, 993.28

3,010.15

CAU
Thia dorument conta

Bes. «cp

*Proration of
Charges to Units

Po Pe

Reinforeed concrete base below grade, structural steel abow grade, anchored to
base and providing means for adjusting and colemping collimator bleeks into proper
position, Collimtor bloeka furnished by others. The variations in the stations

Station 5

+

Y

TRMRXI COLLIMATOR, STATIONS &/, of, STATION Bf

Sta. Ho. Gf Footings Type II
26'~0" x 10'-0" x &'-0"=
Sta. Mo. Sf Pootings Type KAVI! 22-0" x 10'-O" z '=0%s

or 2)

"Not for use by A-E

LOCATION SMGRBI ISLAMD - SITE Ef

—AT-1 29-1 1-507

The Complete Construction of

GESCRIPTION OF PROPERTY UNITS

de

Select target paragraph3