ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE

SFO.43 a
(3. 50)

Selina.

COMPLETION REPORT FOR

AS-BU}LT DRAWING NUMBERS AND DATES:
65-086-3

-

JOB NO. J29 - Bf

5/16/51

CONTRACT NO. 29-1
For:

The Complete Construction of

SHEET NO,”

3

or__

2

*Not for use by A-E”

LOCATION ENGEBI ISLAND - SITE Bf

DATE OF THIS REPORT,

Timing Stations

a

July 1

on

Building No.: Stations 6ef, bof
ESTIMATE

“Property
*ecount

DESCRIPTION OF PROPERTY UNITS

Quantity

Unit

Construction
Cont ract
Cost

Est'd. Value
Gov. Furnished
Material

Engineering
Cost

Total

TIMING STATIONS, STATIONS 6af, Gbd/, SITE Ef
Existing structures rehabilitated, wiring and power supply modified.

A more

detailed description of these Stations may be obtained by referring to Site "&"
Completion Report. Six transformers are used in conneotion with these stations,

Station 6a

2

each

1

each
Direot

Indirect

Station 6d

1

$5, 517 076

.

$29.33

$5,920 ld

28,17

5,510.64

each
Direct

Indireot

50a

20.76

CAU
+ National | et -1
paamisaton ot Fae
any Manner bo

bhibized aod

*prorati
:
ation of

Charges to Units