ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE

Sf0.43 6
(3-50)

COMPLETION REPORT FOR
JOB NO. 6140 - 6,lym,0

AS-BUILT DRAWING NUMBERS AND DATES:

75-503-2

Wala

FS-503-3 4/17/51
F8-503-4, 4/17/S.
FS-503-5 4/17/51
« Property
Account

4/17/51

15-503-8

For:

Waa

FS-503-9 k/17/51
FS-503-10 4/17/51
FS-S03-L1 4/17/51

CONTRACT NO.

a

SHEET §O.

20

or. 23

EMGEBI ISLAND ~ SITE *E*, MUSIN & “Not for use by A-E

AT~1 29-1 1-507

LOCATION KIRIMIAN ISLANDS = SITES S & fT DATE OF THI SgREPORT:

The Complete Construction of Electrical Power Systena, Control & Signal
Public Address, and Radio Back-Up Systeus

1? april 1951

Bullding No, :

ESTIMATE
Quan tit y

DESCRIPTION OF PROPERTY UNITS

13 April 1951 - 7E-089

Unit
n

Construction
Contract
ont rac

Est'd. Value

Gov.
Furnished
‘arene

Engineerin
gine
9
Cost

Total
ota

"Proration
of
Charges on to o Units

TE-O91, TE-O92, 7E-O93, TE-O9k, TE-O9S, TE-096,

TOS, TE-O98, 76-099, OE-S3M0,OE-S3AL ESI2, CHSUD, OESIbLY OESIUS,
QE-53k5, 8E-5347, SE-53b8.

ELECTRICAL POWER SYSTEMS

DISTRIBUTION —- CAMP AREA - Dwg.
- The system includes
‘eet o
feet of secondary
lines, and 750 lineal feet of control lines, 9 voles, 13 transforsers, street

lights, and service drops.

UND:

s
) include survey for and installation of primary and
seccodary power lines, telephone, control and signal, public address systes,
trenching and backfill, special runs of conduit, power post stations and
service connections, and transformers. The magnitude of this feature is indicated

eeeee

Secondary
ae
a
Control & Signal 20,410 LF
Public éddrees
1,615 LF
Primary
16,500 LF
Transforeers

pi

System

DISTRIBUTION - Electricalpower, telephone, control and signal

Sl, Ea

2,190
4,000
3,750
1,800

es

Lay Cable
a

ace

:

.

LP
*t
8,450 LF 2,190 Le
t
LF
250 LF 650,000 LF 33,850 LF
250 LF
LF 1,600 LF 230,000 LF 6,150 LF 7,ki0 LF
LF
16,500 LF 1,800 LF

S Ba

CAUTION
.
phedoceee
1

Distribution Lines
Generation Equipment

Syaten

Direct

$96,803.22

Direct

999,151.70

Indirect!

Located in Bldg. #100

TOTAL - Klectrical Facilities

par maser

53,203.08
22,358.55

Direct

$195,954.92

Control & Signal Systen

Direct

$4,194.10

Redio Back-Up & Public Address

Direct

$576.12

Indirect

eERET

$3,488.11

Indirect}

Indirect

15, 561263

13,426.91

73.56
*

pales eae

$153,49h.b)

$121,510.25

$3,488.13

$275,004.66

$2,127.50

$59, 748051

$171.64

$1,186.32

Select target paragraph3