ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE

SFO.43 @

(3. 60}

COMPLETION REPORT FOR

AS-BUILT DRAWING NUMBERS AND DATES:
5-167

135-207

JOB NO. 640 = 6a,b,0,d

2/13/81

CONTRACT NO. AT-(29-1)-507__

For:

Sine

SHEET NO.

Buliding No.:

23

“Not for use by A-E

LOCATION EMGERI ISLAND ~ SITE *B*

The Complete Construction of Building Location Plan, Site Preperation,

4/6/51

16 _. OF,

DATE OF THIS REPORT: 6
april] 19K.
Ap

and Grading & Paving Roads & Airstrip
ESTIMATE

. Property

account

DESCRIPTION OF PROPERTY UNITS

Quantity

Unit

Construction

Contract

Est'd.

Value

Gov.Furn ' shed

Engi
i
"9 Cost. ng

Total

SITE PREPARATION

Tae camp ares, approximately 700 ft. z 1,600 ft., hes located therein all the
permanent, temporary and existing structures required. The balance of site

preperation extends to all sections of the ialend.

185,356 Sq. da
Direct

Indirect|

$25,033.02

18,342-66

$52h.67

$43,919.35

$45.39

$33,913.28

ROADS
Both paved end unpeved (exclusive of temporary sonstruction roads) amounts to

approximately 12,000 lineal feet of 20' roadway.
pered with 3" asphaltic conorete.

2,700 feet of this road is

Biade & Shape

26, 700

Sq. Ide.

Direct

Indirect

Asphalt Surfacing

6,000 Sq. Ids.
Direct

Indirect

$19,321.15
14,143. 7h

$6,633.58
he, Th .09

$11,378.67

ATRSTRIP
The airstrip, a 100' wide x 2,680' long, graded, crowed, stabilised, and

bitumals sprinkled, runway exteuia in an easterly direction to the ocean.

6,780

Sqe Yee.

Direct

Indirect

MOTE:

$3,864.36

2,634.56

Zero paving, called for on the above drawings, is aocounted for on Tower

"Kaport.

a

Nee

$61.00

$6,779.92

"Proratl
f
Charges toUni ts

Select target paragraph3