ATOMIC ENERGY COMMISSION SANTA FE OPERATIONS OFFICE SFO.43 @ (3. 60} COMPLETION REPORT FOR AS-BUILT DRAWING NUMBERS AND DATES: 5-167 135-207 JOB NO. 640 = 6a,b,0,d 2/13/81 CONTRACT NO. AT-(29-1)-507__ For: Sine SHEET NO. Buliding No.: 23 “Not for use by A-E LOCATION EMGERI ISLAND ~ SITE *B* The Complete Construction of Building Location Plan, Site Preperation, 4/6/51 16 _. OF, DATE OF THIS REPORT: 6 april] 19K. Ap and Grading & Paving Roads & Airstrip ESTIMATE . Property account DESCRIPTION OF PROPERTY UNITS Quantity Unit Construction Contract Est'd. Value Gov.Furn ' shed Engi i "9 Cost. ng Total SITE PREPARATION Tae camp ares, approximately 700 ft. z 1,600 ft., hes located therein all the permanent, temporary and existing structures required. The balance of site preperation extends to all sections of the ialend. 185,356 Sq. da Direct Indirect| $25,033.02 18,342-66 $52h.67 $43,919.35 $45.39 $33,913.28 ROADS Both paved end unpeved (exclusive of temporary sonstruction roads) amounts to approximately 12,000 lineal feet of 20' roadway. pered with 3" asphaltic conorete. 2,700 feet of this road is Biade & Shape 26, 700 Sq. Ide. Direct Indirect Asphalt Surfacing 6,000 Sq. Ids. Direct Indirect $19,321.15 14,143. 7h $6,633.58 he, Th .09 $11,378.67 ATRSTRIP The airstrip, a 100' wide x 2,680' long, graded, crowed, stabilised, and bitumals sprinkled, runway exteuia in an easterly direction to the ocean. 6,780 Sqe Yee. Direct Indirect MOTE: $3,864.36 2,634.56 Zero paving, called for on the above drawings, is aocounted for on Tower "Kaport. a Nee $61.00 $6,779.92 "Proratl f Charges toUni ts