SFO-.43 4

(3. $0)

ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE
COMPLETION REPORT FOR

JOB NO. 640 = 6e

AS-BUILT ORAWING NUMBERS AND DATES:

FS~226

CONTRACT NO.
For;

2/l/Si

AT-( 29-1 )-507

SHEET NO.

S eee:

3

or_23

"Not for use by A-E

LOCATION ENGEBI ISLAND - SITE *E*

DATE OF THIS REPORT:

The Complete Construction of Meld Laboratory

1 February 1951"

Building No.:
ESTIMATE
on

"Property
Account
Number

DESCRIPTION OF PROPERTY UNITS

Quantity

Unit

—

Canstruction
Contract

Cost

Est'd. Value
bov. Furnished
Material

Engineering
Cost

Total

FIELD LABORATORY
One story wood, aluminum, and steel building; rectangular ahape; sise 0.D. 20'.0"
x ip'-0" x 13'-O" high; set on a 5" thick concrete slab; corrugated elusinun
roofing on 2° x 6" rafters and 1" x 6" purlins; walle of 2" x 6" wood
with corrugated steel siding; screened openings at each end, '-O" wide, 3'-0"
from floors plywood partition 3'-6" high; screened doors; electrical wiring and

figtares; piping; benches; floor area 0.D. 800 square feet; cubic content 7,763

cubic feet.

Installed equipment includes:

Two sinks, two scales, one salinity

tester, ons hydraulic test machine, one hot plate, one cement measure, one muffled
furnace, one torsion balance, one indicator, one drying oven, one sani shaker,

one laboratory still, one oube mold, one compaction kit, one drafting stool, ons
testing kit, one platimm crucible, one cook stove, one drafting machine, one
calculator, one typewriter, and one pneusatic drill.

Direct

$3,996.82
3,167.19

$56.75

$7,220.76

- document
P National t?

TaN ot
any anber

Dhibiated ane
halties und)

"Proration of

Charges to Units