ATOMIC ENERGY COMMISSION
-= SANTA FE OPERATIONS OFFICE
SFO. 436
{3-)
JOB NO. 6y0 - Sg
AS-BUILT DRAWING NUMBERS AND DATES:
5115-2
20-018. 3
S4-6R-ET
COMPLETION REPORT FOR
2/2/51
CONTRACT AQ.
For:
2/2/51
*Property
Account
=
Unit
Construction
Contract
Est'd. Value
Gov.Furcal sned
En
gineering
Cost
.
Total
Canvas and wood construction; sise O.D. lh'=2" x L'a" x 11'=-6"; anchor bolted
iy ridge; electrical wiring and fixtures; slab area 0.D. 206 square feet.
1?
1
Each
Zach
Direct
$370-b4
Direct
$29 , 264.60
Indirect
TOTAL - 79 Units
Indirect
296.56
23,426.15
»
ESTIMATE
SIZE - OM C
to a 6" concrete alab; canvas fly separated from tent roof by spacer blocks and
iv
“
Taate
1 thru 50, and 121 thru 149
Quantity
JF
2 February 1961
The Complete Construction of
DESCRIPTION OF PROPERTY UNITS
2
"Not for use by A-E
AQMOM, BIIJIRI, ROJOA,
LOCATION & EBERIRU GROUP - SITES "D-y" DATE OF THIS REPORT:
AT-( 29-1 )-507
Buliding No.:
SHEET 0.
2.26
$669 .26
$178.60
$52,871.35
Proration of
Charges to Units