ATOMIC ENERGY COMMISS1ON
> °* SANTA FE OPERATIONS OFFICE
COMPLETION REPORT FOR
tots
AS-BUILT ORAWING NUMBERS AND DATES:
5-12
qt
JOB NO. G40 = k(e)
2/13/51
CONTRACT NO, _AT=(29~1)-507_
For:
PERT
.
LOCATION RUMIT ISLAMD - SITE "C*
suttt wo_20._
or 20
Page ls
Not for use by A-E
DATE OF THIG REPORF:
The Complete Construction of Paint & Tool Shed
13 February 1951
;
Bullding No.: 12h
ESTIMATE
“Propert
Account
DESCRIPTION OF PROPERTY UNITS
Number
Quantity
Unit
Construction
Contract
Cost
Est'a.
Value
Gov. Furnished
Material
Engineering
Total
.
Charges toUnite
a
PAINT & TOOL SHED
One story, wood freme, shed roof, sides ani roof covered with corrugated sheet
steal with exception of open front of paint shop, erected on a 5" concrete sleb,
wise 13'-8" x 30'-0", 410 square feet, o
te with electrical wiring end
fixtures.
The sise I.D. is 7'-h" wide x
oontent of 1,666 oubic feet.
29-4" long x 7'-9" high with a cubis
1
Keach
Direct
$265.97
LTie docum
the National
SHIPET
YDS a
&
*
jee
' “hited