_ ~m ATOMIC EWERGY COMMISSION SANTA FE OPERATIONS OFFICE SFO. 416 13.90) COMPLETION REPORT FOR AS~BUILT ORAWING NUMBERS AND DATES: JOB NO. 610 CONTRACT NO. For: SHEET WO. i. . AT-( 29-1 }-507 LOCATION PARRY ISLAND - SITE “B® Paget 73, "Not for use by A-E 103, DATE OF THIS REPORT: 156, 6 November 1950 The Comptete Construction of Water Facilities System Buliding No.: or__66 19 April 1951 1 220, 255, 312, 326, and 410 May 19 1951 ESTIMATE "Property Account DESCRIPTION OF PROPERTY UNITS Quantity unit Construction Contract Est'd. . iF Value h ed Govefurois Engineering Cost Total CONCRETZ RESERVOIR FRESH WATER STORAGE - FS-336 - 5/2/52 A reinforced concrete structure, 5 feet below grade, sise 0.D. 52'-3" x S1'-6" (2,690 aquare feet) x 12'-1]1", two compartaent (13,500 cubic feet total capacity) with 9* walle and 8" floors, the flat wood frame roof, slightly sloping from the supporting center wall, is a 2 ply built up cower over 1" x 6" sheathing, with screaned venting between outside walls and the roof, complete with inlet and outlet piping systems to each compartment. 1 System Direct $3h,222.29 Direct $236,569 264, Direct $375,640.02 Indirect BD 630-48 $454.97 $65,337-7h $4,463.02 $300,653.79 96,626.26 $538,395.11 SQULPMENT Including pumps, distillation unite, and fittings. TOTAL — Water Facilities Complete Indirec Indirec 59,851.13 156,128.83 “ eo 123, 12h; 132 128, 127 *Prorati t Charges onto o Unite

Select target paragraph3