if ATOMIC ENERGY COMMISSION SANTA FE OPERATIONS OFFICE SFO-43 6 (a. 80) COMPLETION REPORT FOR AWING N NUMBERS RS AND DATES DATES: AS-BUILT DRAWING JOB NO. 640 CONTRACT NO. AT=(29-15-507_ For: sHect wo. Se LOCATION : Not PARRY ISLAND - SITE *B" or 68 73, for use by A-E 103, DATE OF THIS REPORT: 16 November 1950 The Complete Construction of Water Facilities System Buliding No.: Oh 156, 123, 19 April 1951 220, 255, 312, 326, and l0 12h, 132 1 May 1951 138, ESTIMATE i Property Account I DESCRIPTION OF PROPERTY UNITS painted, complete with tank, pump, and piping. One acid pump, and one wood tank. Installed equipment includes: Qua ntit y Unit fn 1 Each Construction Contract cere Est'd. Value Gov.laterlal Furnished 127 Engineerin 9 Cost 9 "Proration of Charges to Units Total . Direct Indirect, $645.50 358.07 $21 243 $1,225.00 SALTWATER PUMP STATION AND WELL ~ Bldg. - 28-130 thru FS-193 - 11/16/50 Thie is a one story, double roofed, prefabricated aluminum building, erected on a 25%~2" n 33'-10 1/2" concrete slab which includes four pump foundations, a pipe tranch with drain facilities, nine pipe supports, and a salt water well 21,'-6" deep. The well consists of a 9' x 10' x 10' reinforced concrete seepage box buried below an 8' section of '-6* I1.D. reinforced concrete pipe, a reinforced concrete box |,'-6" x l'-6" x 6'-6" rises above the pipe and becomes an integral part of the footing and slab. The building is complete with electrical wiring, fixtures, and equipmant for automatic control, and suctionand discharge piping systema with connections to salt water system. Three 300 G.P.M. pumps - motor driven, and one 300 G.P.M. pump - gas engine driven are installed in this building. The sise I.D. is 24'-0" x 32'-8 1/2" x 10-0" mean height with a cubic content of 7,850 cubic feet and a floor area of 852 aquare feet. \. 1 Rach Direct Indirect! $5,898.11 1,926 047 ~ N $132.11 $7,956.69 $658.68 $71,230.13 N SALT WATER SISTEM - 9B-503 & 9B-5u2 - s/i/sh Piping system, salt water, outdoor, consists mainly of 6" and i" transite pressure pipe, 2'-6" undergrount, valves, fittings, and services to the extent of 10,328 lineal feet of mains, 6) service connections and 2] fire hydrants. 1 System Direct Indirect FRESH WATER SYSTEM - 9B- & 9B '. - Piping system, fresh water, outdoor. Consists mainly of 3" and lL" transite preseure pipe, 2'-6" underground, valves, fittings, and services to the extent of 9,110 lineal feet of mains and 6& service connections. 1 Systen Direct itr Contimued on next page $43,984.97 $37,836 22,782ek6 ‘4 $597.52 TIO pire ind Pil the ade oma doe Stal ju ty

Select target paragraph3