ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE
SFO- 436
13.36)
COMPLETION REPORT FOR
AS-BUILT ORAWING NUMBERS AND DATES:
Fs-6
2% (2
Shta.
Shte.)
JOB NO.
640
5/1/51
CONTRACT NO.
For:
_AT-( 29-1 4-507
We
LOCATION
SHEET 0.
58
OF
68
“Not for use by A-E
PARRY ISLAND - SITE "B*
DATE OF THIS REPORT:
May 1951
The Complete Construction of, or Alteration to Miscellaneous Buildings and
Facijitiesnok, covered by detailed As-—Built drawings.
ESTIMATE
"property
Account
DESCRIPTION OF PROPERTY UNITS
Number
Quantity
Unit
Construction
Contract
Cost
Est'd. Value
Gov. Furnished|
Material
.
Erg! neering
Cost
Total
pe
BLDG. NO, NAME
“This doc
190
tranzei~
front, on 6" concrete slab, sise approximately 32' x 50', complete
with plumbing and electric services, 1,600 square fect.
191
the Nation
FRATERNAL HALL -— wood frame, composition roof, sheet metal sides, open
STORAGE ROOM - north of Freight Pier, wood structure, size approximately
12' x 20' x 10' high, 2l0 square feet.
1
Each
Direct
Indirect}
1
Each
Direct
Indirect
19h
STORAGE TENT - near Building #232, eise approximately 15' x 31".
1
Each
Direct
Indirect!
195
SHOE REPAIR SHOP - wood, size approximately 10' x 12' x 10° high, 120
aquare feet.
1
Bach
Direct
reeset
199
SOFT BALL DIAMOND and Backstop (Practice).
1
Rach
BASE BALL FIELD - Back stop and benches.
1
251
AMNOUNCERS BOOTH - wood, 10' x 12' x 10' high, 120 square feet.
1
252
REFRESHMENT STAND - wood structure, 25' x 25' x 10' high, 625 square feet.
1
BAR-B-QUE PIT - concrete and steel, sise approximately |" x 12' x 3' high.
1
Sire
759 0&5
$52.79
571.36
$318.96
319.92
Each
Direct
$116.32
Each
191.43
Direct
Indirect
$35.96
379.93
Each
Direct
9697.92
Bach
Direct
Indi rect
Continued on next page
$697.92
$175 .83
Indirect
253
$12,939.72
14,680.7h
Direct
Indirect
250
many
759085
.» .886.56
Ng 02S
prohibit
;
$27 ,620.46
$1,457.77
$1,096.15
$728.88
.
$367.26
$728.89
$1,457.77
$150.81
.
Eroration of
arges to