COMPLETION REPORT FOR
3/19/52
28-5190 3/19/52
23-065 3/19/51
2B~066 3/19/51
2b-087
3/19/51
28-5637
"Property
640 - 1
JOB NO.
AS-BUILT ORAWING NUMBERS AND DATES:
28-5427
3/19/51
28-5135 3/19/51
28-560 3/19/51
25-5657 3/19/51
28-5131 3/19/52
25-042
2B=5h29
2B~5635-2
2B~5lbh
2B~067
3/19/51
3/19/51
2/2h/S2
3/19/52
3/19/51
CONTRACT NO.
For:
_AT=129-
2, February 1951
19 March 1951
No.:
. 158,
159,
161
327, 330, 331, and 333
Quantity
Unit
Construction
Est'd. Value
Cost
Gov, Furnished
Material
Cont ract
Engineering
Cost
Total
CMR AREA
LABORATORY - Bidg. $329 - Dwgs. 2B-5639 thru 2B-5135 - 3/19/52
This ia a one story double roof, prefabricated alumimm building with wood frame
interior partitions, erected on a 5" concrete floor slab size 61'-10 1/2" x
35'=3", complete with electrical wiring and fixtures, fresh and salt water
plumbing, air conditioning ducts, roof ventilators and blowers. The inside
dimensions 60'-3 1/2" x 2h'~0" x 10'-O" high gives a cubic cantent of 14,560
cubic feet and a floor area of 1,456 equare feet.
installed equipment includes:
One debumidification unit, one drier, one unit drawer, and one water cooler.
BUILDING $330 - Dwgs. 28-56L0 thru 28-5429 - 3/19/51
One story rigid frame construction with corrugated aluminum roofing and siding,
covered wood frase interior partitions, erected on 5" thick concrete slab
4O'~O" x 80'~6" (49.4 cy) plus equipment foundations and pita. Has one shed roof
extension 60'-0" x 10'-8" over additional 5" thick concrete slab, same dimensions
(9.9 cy) and another 9'-8" x 40'-6" ower existing slab. Total floor area 4,636.9
squere feet casplete with plumbing, electrical and ventilating installations.
Installed equipment includes: Weter cooling units, pumps, and air compressor.
SHALTMR - Bldg. $331 - Dwg. 2B-5635.2 - 2/24/52
An underground shelter of reinforced concrete, mith top of roof at grade level,
size 0.D. 8t-2" x B'=2" x 9'-O" high including 1'-2" floor and foundation, 10"
thick walls and roof, blast proof door, 6" concrete ramp 6'-0" wide x 3h'-O 3/h"
long with concrete retaining walls. A wood frame structure over the ramp and
extanding 20' from the shelter protects the antrance and retains the 5'-O" builtin abelving and rent pipe.
C
BUILDING 9333 - Duge. 28-SLuy thru 28-5427 - 3/19/51
“The docum
the National
tranamiesion
One story wood frame construction with corrugated aluminum roofing and siding.
Interior walls and ceiling of 3/8" plywood.
a 157,
ESTIMATE
DESCRIPTION OF PROPERTY UNITS
Account
Number
DATE OF THIS REPORT:
Tne Complete Construction of CMR Area
Bullding
P;
*Not for use by
LOCATION PARRY ISLAND - SITE "Bb"
Erected on 5" thick concrete slab
18'=9" x 15'-0" (4.3 cy). Overall dimensions 15'-O" x 16'-9* x 14'-3" high.
Total interior floor area 208 square feet complete with electrical and ventilating
installations
TOTAL - CMR Area
Sieeter-T
~~.
Indirect
$276,681.22
176,257613
$4,627.25
*Proration of
Charges to Units