aorta.
.43e
70.43
ATOMIC ENERGY COMMISSION
SANTA
FE
OPERATIONS
OFFICE
COMPLETION REPORT FOR
AS-BUILT DRAWING NUMBERS AND DATES:
2B-190
JOB NO.
-1/19/51
26-372.—19/51
28-434
28-5168 1/19/51
1/19/02
CONTRACT NO.
For:
S
AT-( 29-1 }-507
sweet wo._4l
¥
Ge..
LOCATION
or_68
“Not for use @y ronee
PARRY ISLAND - SITE "Bp"
10)
DATE OF THIS REPORT:
19 Jamary 1951
The Complete Construction of Control Building
Bwiiding
ing
No.:
No.: 311
ESTIMATE
"Property
Account
Number
DESCRIPTION OF PROPERTY UNITS
Quantity
unit
Construction
Contract
Cost
Est'd.
Value
Gov. Furnished|
Materlal
.
Engineering
Cost
Total
CONTROL BUILDING
One story aluminwa construction; rectangular shape; sise I.D. 24'-0" x 2h'-8 1/2"
x 12'-0"; set on 5" thick concrete slabs double roof, saparated by 2" x lh" redwood; vented window panels; aluminum partitions; with lighting and power services;
plumbing; floor area 0.9. 651 square feet; cubic content I.D. 5,930 cubic feet.
Installed equipment includes a dehumidifier unit.
1
Each
Direct
Indirect
$4,979 012
3,874.57
$69.16
$6 922.85
.
.
Proration
Units
arges to of