Loy
s
.. o
AS-BUILT DRAWING NUMBERS ANO DATES:
eee
12
2B=132
12/8/50
2B-618 12/8/50
4B-315 12/8/50
JOB NO. 640 - 1
tee
ele
Mba
Bp! a5
12/0/3
B-318
12/8/50
B-42k
12/8/50
4B-b20 12/8/50
4B-421 12/4/50
l*property
ATOMIC ENERGY COMMISSION
ANTA FE
OPERATIONS OFFICE
e
COMPLETION REPORT FOR
CONTRACT NO.
For:
FS~337 1/19/51
.
LOCATION
a OF THIS 1st
PARRY ISIAND ~ SITE "B*
The Complete Construction of Power and Distillation Plat and Addition
Buliding No.:
DESCRIPTION OF PROPERTY UNITS
Account
AT—(29-1)-507_
sucet wo.3H sor68
Ses
Pages 90, 94, 9-2
Not for use by A-
December 19
19 April 1951
301
ESTIMATE
Quantity
Unit
Construction
Contract
Est'd. Value
Gov.purntshed
En
gineerin
9
Cost
.
Total
Prorati toUnits
f
Charges
POWER AND DISTILLATION PLANT BUILDING AND ADDITION
One etory concrete and alumimm construction, rectangular shape, sise I.D. 52'-0"
x 88'=8 1/2" x 18'-O", set on 6" reinforced concrete slab, with drain facilities
and pipe tunnels, reinforced concrete equipment foundations and columns; 6'-0"
high x 9" thick concrete walls below §'-0" wall panels; twin gable roof with
longitudinal drain trough at center, double roof separated by 2" x )" redwood,
vented window panels, aluminum partitions, chain link and pipe fence; piping; with
electrical services and alarm systems; plumbing; floor area 0.D. 5,626 square feet;
cubic content I.D. 87,400 cubic feet.
Installed equipment includes: One water cooler with drinking fountain and piping
systems for compressed air and fuel of] leading to four tanks outside the building,
These piping systems are in addition to the salt ami fresh water piping systens
within the building.
Costs recorded on this sheet does not include equipment
installed for generating electrical power and water distillation.
1
Each
Indirect
28,030. 48
$872.67
$7,362 pers)
J
Pod ty
¥
‘
¢