COMPLETION REPORT FOR
AS-BUILT DRAWING NUMBERS AND DATES:
2B—
2/24/51
7B
ope
ia
eke
2B430
2/24/51
2B-5324
2B-340 2/2h/51
—~—
"Property
Account
JOB NO.
2/2u/51
640 - ld
28-5157 2/24/51
S
CONTRACT NO, 29-15-5097
For:
eater
18
68
sHeeT wo. 19 ofOF
LOCATION
“Not for use by aeneee u7
PARRY ISLAND - SITE "B"
&
16
DATE OF THIS REPORT:
The Complete Construction of H & N Administration Building
2h February ary 1951
Bultding No.: 208
2/24/51
ESTIMATE
Quantity
DESCRIPTION OF PROPERTY UNITS
Unit
Construction
Contract
Est'd. Value
Goveoral shed
Engineering
Coat
.
Total
H_& N ADMINISTRATION BUILDING
This ie a one story, double roofed, prefabricated aluminum building erected on a
S*® concrete slab, size 176'-3/h" x 25'-2" and an East wing 102'-6 1/2" x 25'-2",
total floor area, 7,050 square feet, complete with electric wiring and fixtures,
fresh and salt water plumbing, telephone installations, storage hot locker and
an adjoining reinforced concrete vault, sise O.D. 9'=-0" x 12'-10 1/2" x 9'-0"
high with 6" floor slab end foundation, telephone exchange and dehumidification
equipment.
Installed equipment includes: Three water coolers with drinking fountains, two
clocks, ona blue print machine, and a blue print cabinet.
1
Each
Direct
Indirect
SOP
$55,678.05
27,002.51
$1,126.82
$84,407.38