“ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE
SFO. 430
(3.50)
COMPLETION REPORT FOR
JOB NO. 640 = Id
AS-BUILT DRAWING NUMBERS AND DATES;
2B-103
23-126
2B-309
23-108
a
12/12/50
12/12/50
12/ 9/50
12/12/50
Property
CONTRACT NO.
For:
LOCATION
SHEET WO.
Building No.:
1h _or68
“Not for use by A-E
PARRY ISLAND - SITE "Bb"
Page 38
DATE OF THIS REPORT: &
The Complete Construction of a Bakery
12 December 1950
202
ESTIMATE
DESCRIPTION OF PROPERTY UNITS
Account
Number
AT-(29-| 1-507
eeee-T
Quantity
unit
Construction
Contract
Cost
Direct
Indirect.
$25,701.52
5,691.73
Est'd. Value
Gov. Furnished
Materlal
Engineering
Cost
Total
BAKERY BUILDING
This is a one stary, double roofed, prefabricated aluminum building erected on
a concrete alab; the slab includes an 18" thick oven foundation, size 1i'-2" x
10'~1"; complete with electrical wiring and fixtures; the plusbing includes
piping for hot and cold water, stem, and condensate, and an oil line; telephone
installation, and aluminum partitioning.
The aise of this building inside is
2h'-O" wide x 46'-8 1/2" long x 10'-O" high. The total floor area of this
building is 1,255 square fest, and the total content is 11,688 cubic feet.
A concrete slab 6'-0" x 10'-O" provides a foundation for a covered passage way
to the adjoining Mess Hall; a 300-gallon oi] storage tank is mounted on concrete
piers '-O" above ground at the Morthwest cornsr of the buildings all windows
and exit doors are scremed.
This building contains the following equipment and furniture: One 60 cubic foot
and one 80 cubic foot reach-in refrigeratora; one single and one double stain-
less steel sinks; two ice cream cabinets; one freezers one hardening cabinet;
three mixers; one steam kettle; one doughmut kettle; one bake oven with hood and
exhaust fanj one fan with stands one scale; one juice extractor; two proof boxes;
two bread racks; ons bun divider; one stainless steel bins one bench; one fry
kettle; and three wrk tables.
1
$407.77
$30,801.02
"Proration of
Charges to units