ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE
Sra. 436
(8. 00)
COMPLETION REPORT FOR
JOB NO. 640 -Sa & g
AS-BUILT DRAWING NUMBERS AND DATES:
1-22
3
6
Mb/s
CONTRACT NO.
For;
Sete
sweet wo._2h or39
"Wot for use by A-E
AOMON, BIIJIRI, BOJOA,
AT=( 29-1 1-507
LOCATION & EBERIRU GROUP - SITES “D-¥" DATE ee REPORT:
6april‘s.
The Complete Construction of Roads & Buildings ~ Caap Area
=~
.
Bullding No.:
ESTIMATE
“Property
DESCRIPTION OF PROPERTY UNITS
*ecount
Quantity
unit .
Construction
Contract
Cost
Eat'd. Value
Gov. Furnished
Materlal
Engl
ngl neering
Cost
Total
0738.50
$51,326.55
ROADS AMD BUILDINGS - CAMP AREA
The comp area, approximately 500 feet x 1000 feet, includes ecientifia station
#69, power house and other facilities for the cmp including an open air movie.
Temporary es well as permanent water distillation facilities, tents, sheis, md
tanks. The roads approximate 1500 linsal feet and the original tent area was
inereseed from 530 to 79 ~- four nan tents.
salt water overflow.
A pit is provided to take oare of the
Site Preparation
1
135,120
Site
aq. yds.
Direct
Indirect
$33,651.53
16, 736-52
@
°p
roration of
Charges to Units