>
SFO. 436
(3.80)
ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE
COMPLETION REPORT FOR
JOB NO.
AS-BUILT DRAWING NUMBERS ANO DATES:
640 = Se
2/10/51
For;
Qin
SHEET NO.
3
. OF.
ig
“Not for use by A-E
AOMON, BIIJIRI, ROJOA,
CONTRACT NO, _AT=(29-11=507_
LOCATION & EBERIRU GROUP - SITES “D-y" DATE OF THIS @EPORT:
10 February 1951
The Complete Construction of Open Air Motion Picture Theatre
20-949-2
Buliding No.:
~~
100
ESTIMATE
“Property
Account
Number
DESCRIPTION OF PROPERTY UNITS
Quantity
unit
Construction
Contract
Cast
Est'd. Value
Gov, Furnished
Material
Engineering
Cost
Total
OPEN AIR MOTION PICTURE THRATRE
The projection room is a one atory, wood frame, shed roof corrugated aluminun
covered, corrugated aluminum sides, complete with electric wiring, fixtures, and
equipment, erected on a i" concrete alab sise 61-0" x 11'-6", 92 square fect.
The inside dimensions are 7'-4" wide x 10'=10" long x 7'=11" high, with a cubic
content of 630 cubic feet.
A 13'=0" x 16-0" wood screen structure is mounted on and braced from concrete
piere and elevated '-0" above grade. The screen is plywood 13'-0" x 16'-0"
peinted white with 2'-0" black border arcund all four sides. Steps and a platform lead to a stage 8'-0" x 16'-O" elevated 2'-O" in front of the screen
serepreee, The distance from the screen to the front of the projection room
ia 59 '=6".
Benches with back rests provide seating in the area between the two above
mentioned structures.
Equipment includes two 16 MM projectors.
Direct
Indireat
$4,154.12
2,765618
$57.02
$6,979 .32
*Proration of
Charges to Units