“ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE
COMPLETION REPORT FOR
AS-BUILT ORAWING NUMBERS AND DATES:
10C-510
JOB NO.
640
3/23/51
CONTRACT NO.
For:
sneer wo.
Ss
AT~i 29~1 1-507
LOCATION
18
or 20
“Not for use by Ace Page 29eL
BUWIT ISLAND - SITE *c*
DATE OF THIS REPORT:
The Complete Construction of Sewer System
9
1958)
Bullding No.:
ESTIMATE
"Property
Aecount
DESCRIPTION OF PROPERTY UNITS
Quantity
Unit
Construction
Contract
Est'd, Value
Gove urn ished
-
giCost
nearing
.
Total
Tt
SENER SYSTEM
Consists of two underground Lines of 8 vitrified olay pips, total length 1,162
feet, 5 corrugated metal manholes, 500 feet of corrugated metal pipe outfall,
concrete anchor blocks spaced every 5O feet along the outfall, 316 feet of 6*
service branches, and one 6" drain line from the power house directly into the
lagoon.
+
1
Kach
Direct
Indirect
$9,071.37
6,073.10
$995.77
$16,140.5)
Proration
Charges
to of
Units