ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE
SFo.43e
13-80)
COMPLETION REPORT FOR
AS-BUILT DRAWING NUMBERS AND DATES:
2b-108
JOB NO,
640 = ld
we
For:
25-123 22/
28-402 12/ 7/50
CONTRACT NO. _AT=(29-1)-507__
eee
LOCATION PARRY ISLAND - SITE *B*
The Complete Construction of 36 Man Quarters
Buliding No.:
a2 ye 12
“Not for usalby Agt Opclutive
DATE OF THIS REPORT: and Page 16
8 December
199
100 to 110 Inclusive and 206
‘Minor variations in the construction of different buildings
"Property
Account
SHEET WO. 2 or_68
ESTIMATE
DESCRIPTION OF PROPERTY UNITS
Quantity
i
Unit
Construction
Cc ont ract
Est'd. Value
.&F
Boyeere
ahed
Engineering
Cost
Total
26 MAN QUARTERS
This is a ane story, double roofed, prefabricated aluaimm building erected on a
concrete slab, complete with electrical wiring and fixtures, fresh and salt
water plumbing, telephone installation, end alumious partitions providing nine (9)
roams, toilet and showers, corridor md vestibule. The sise inside is 2),'-0" wide
x 128'=8 1/2" long x 10'-O" mean height. The total floor area of this building
ie 3,268 equare feet and the cubic content is 30,890 cubic feet.
This
contains the following equipment and furniture: One 10 gallon
water cooler with drinking fountain; one wall type telephone; two fire
extinguishers; six mirrors; 36 alumimm lockers; and 36 beds,
12
i
Zach
Each
Direct
Indirect}
TOTAL COST
12
Unite
$27,936.00
10,100.28
$530.70
$35,566.98
$462,803.76
"Prorat
'
ation
Charges
to o Unita