COMPLETION REPORT FOR
JOB NO.
AS-BUILT DRAWING NUMBERS AND DATES:
Foul
640 = k(e)
2/13/51
CONTRACT NO,
For:
_AT-1 29-4 1-507
S aes
sueet wo. 2)
or 20
Page 16
"Not for use by AE
LOCATION UNIT ISLAND - SITE "C"
DATE OF THIS REPORT:
13 February 1951
The Complete Construction of Carpenter Shop
.
Buliding No.: 123
ESTIMATE
"Property
DESCRIPTION OF PROPERTY UNITS
Account
Quantity
unit
Construction
Contract
Cost
Est'd.
Vaiue
Gov.Material
Furntshea!
Enal
Engineering
Cost
Total
CARPENTER
One story, wood frame, gable roof, enclosed on three sides only, plywood and
screen on sides, corrugsted aluminum roofing, erected on a 5" sonarete alab, sise
20'-O8 x yO0'-O0", 800 square feet, electrical power.
The sise I.D. 19'-8" wide
x 39'=k" long x 10'-8" high, with a cubic content of 8,255 ouble feet.
Installed equipment inoludes:
one generater set.
Two drills, one portable saw, one table sew, and
i
Each
Direct
Indirect
$518.96
298.95
*
$817.91
"Prorat
oroes to unite
Charges to Units