ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE
aor
COMPLETION REPORT FoR
AS-BUILT DRAWING NUMBERS AND OATES:
2-517 2/24/51
28-5326 2/2/51
JOB WO.
G40 -1f
.
CONTRACT WO.
For:
AT-( 29-1 1-607
LOCATION
The Complete Construction of
Buliding Wo.:
SWEET WO.
aay
. Not
PARRY ISLAND - SITE "B*
2
or 6i
for use by A-E
Page el \
DATE OF THIS al .
24 February
§ Man Tents
Sl Thru 99 & I9A
ESTIMATE
"Property
Account
DESCRIPTION OF PROPERTY UNITS
Quantity
Unit
Construction
Contract
Est'd. Value
Gov.Furl shed
.
Engineering
Cost
Total
8 Maw TENTS
An eight man tent and wod frame anchor bolted to a i" concrete slab, size
15'=-10" x 31'~10", slab area 50), square feat, complete with electric wiring
and fixtures.
TOTAL COST
50
Each
i
Each
50
Unite
067,935.11 |
.
Proration
Charges
to of
Units