-_.
SFO. 43 4
13.90)
ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE
Sey
COMPLETION REPORT FOR
JOB NO. 610 = hile)
AS-BUILT DRAWING NUMBERS AND DATES:
eweee
EN
ee
ve
WAL35-5
2B-13520-0464
92/5/5258
2/5/51
28-183-h
2/5/51
2/5/51
2/5/51
CONTRACT NG.
For;
“Not for use by A-E
RUNIT ISLAND ~ SITE "c*
Bullding No.:
OESCRIPTION OF PROPERTY UNITS
100, 101, and 108
Quantity
Unit
3
Bach
1
Each
5 February 1951
»
ESTIMATE
Construct lon
Contract
Est'd. Value
Gow,Furnished
Page 3
DATE OF THIS REPORT:
The Complete Construction of Showers & Latrine
"p
secount
LOCATION
AT-( 29-1 1-507
SHEET Wo.) or_20
Engineering
Total
‘
*
Charges to Unite
SHOWERS & LATRINE
Cue story alunimem structures rectangular shape; sise I.D. 2h'-O" x 36'-8 1/28
x 12'~O" high; set on a 5" thick concrete slab, sloped to seven floor drains,
double roof separated by 2" x i" redwood; vented window panels; aluminum partitions,
with electrical service; plumbing; floor ares 0.D. 95k square feet; cubic content
1.D. 6,810 cubic feet; 16 lavatories, 6 water closete, 6 urinala, and 16 nirrore;
plywood supply cabinet. Outside ~TO square feet.
Shelves.
Installed equipment includes:
in aaah building.
concrete slabs; 4" thick, 3'-6* x 5'-O8,
One elactric water cooler with drinking fountain
Indirect
4925-66
$120.1
$11,756.05
Indirect
14,746.98
$330.33
$4,268.14
affecting
Shistes dite
we
ounte nia
PPTs rte ts
| Lawn.”