_ ~m
ATOMIC EWERGY COMMISSION
SANTA FE OPERATIONS OFFICE
SFO. 416
13.90)
COMPLETION REPORT FOR
AS~BUILT ORAWING NUMBERS AND DATES:
JOB NO.
610
CONTRACT NO.
For:
SHEET WO.
i.
.
AT-( 29-1 }-507
LOCATION PARRY ISLAND - SITE “B®
Paget 73,
"Not for use by A-E
103,
DATE OF THIS REPORT:
156,
6 November 1950
The Comptete Construction of Water Facilities System
Buliding No.:
or__66
19 April 1951
1
220, 255, 312, 326, and 410
May
19
1951
ESTIMATE
"Property
Account
DESCRIPTION OF PROPERTY UNITS
Quantity
unit
Construction
Contract
Est'd.
. iF Value
h ed
Govefurois
Engineering
Cost
Total
CONCRETZ RESERVOIR FRESH WATER STORAGE - FS-336 - 5/2/52
A reinforced concrete structure, 5 feet below grade, sise 0.D. 52'-3" x S1'-6"
(2,690 aquare feet) x 12'-1]1", two compartaent (13,500 cubic feet total capacity)
with 9* walle and 8" floors, the flat wood frame roof, slightly sloping from the
supporting center wall, is a 2 ply built up cower over 1" x 6" sheathing, with
screaned venting between outside walls and the roof, complete with inlet and
outlet piping systems to each compartment.
1
System
Direct
$3h,222.29
Direct
$236,569 264,
Direct
$375,640.02
Indirect
BD 630-48
$454.97
$65,337-7h
$4,463.02
$300,653.79
96,626.26
$538,395.11
SQULPMENT
Including pumps, distillation unite, and fittings.
TOTAL — Water Facilities Complete
Indirec
Indirec
59,851.13
156,128.83
“
eo
123,
12h;
132
128,
127
*Prorati
t
Charges onto o Unite