ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE
a. sor
COMPLETION REPORT FOR
AS-BUILT DRAWING NUMBERS AND DATES:
.
2B-158
28-139
12/23/90
12/23/50
2B=428=3
12/23/50
28-330
12/23/90
Property
Account
JOB NO. 640 + ld
CONTRACT NO.
;
For:
AT—( 29-1 }-507
sweet wo.45 or_68
QT
“Not for usp by ae Page 108
LOCATION PARRY ISLAND ~- SITE "B"
DATE OF THIS REPORT:
23 December 1950
The Complete Construction of Sheet Metal Shop
Bullding No.:
316
ESTIMATE
DESCRIPTION OF PROPERTY UNITS
Quantity
Unit
1
Each
Construction
Contract
Est'd.
Value
Coeteeta ned
Engineering
Cost
Total
$275.74
$17,940.50
SHEET METAL SHOP
One story alusime construction; rectangular shape; size I.D. 24'-O" x 60'-8 1/2"
% 12'=O"; set on 5" thick concrete slab; double roof, separated by 2" x 4” redwood; vented window panels; aluminum partitions; with light and power services;
telephone installation; plumbing floor area 0.D. 1,557 square feet; cubic content
I.D. 14,569 cubic feet; three sliding doors; benches, rack and shelving; concrete
entrance pads - three 3'-6" x G'-0", one 3'-6" x 5'-0", total 102 square feet.
Installed equipment includes: Two drills, one grinder, one squares shear, two
metal brakes, one comb. bench machine, one setting down machine, one rotary
machine, on# slip roll machine, one solder furnace, one hand bending brake, one
petal hand shear, and one water cooler with drinking fountain.
Direct
Indirect
$13,513.16
k,151.60
“Proration of
Charges to Units