ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE
5FO.43 4
(3. 30)
COMPLETION REPORT FOR
JO8 NO.
AS-8uUILT DRAWING NUMBERS AND DATES:
2B-156
64,0 -1
12/23/50
For:
12/23/90
2B-329
12/23/50
2B-426—4 12/23/50
25-120
“Property
Account
CONTRACT NO.
LOCATION
AT—( 29-1 1)-507
Tne Complete Construction of
Buliding No.:
SHEET wo.
S
43
OF. 68
"Not for use by Aq
PARRY ISLAND — SITE "3"
pose 205
DATE OF THIS REPORT:
23 December 1950
Plumbing and Refrigeration Repair Shop
Ry
ESTIMATE
DESCRIPTION OF PROPERTY UNITS
Quantity
unit
1
Each
Construct lon
Contract
Cost
Est'd. Value
Gov.Materlal
Furnished
Engineering
Cost
Total
PLUMBING AND REFHIGEAATION RePAIR SHOP
Une story aluminum construction; rectangular shape; sise J.D. 24'-O" x Bo'-8 1/2"
xX 12'~0"; set on 5" thick concrete slab; double roof, separated by 2" x i" red-
wood; vented window panels; aluminus partitions; shelving; benches; 3 hot lockers;
outside pipe rack; with light and power services; plumbing; floor area 0.D.
2,060 square feet; cubic contents I.D. 19,370 cubic feet; three sliding doors.
installed equipment includes:
(Ome water cooler, one grinder, and two telephones.
Indirect
5,376.3h
Se...
$319.98
dog
$19,938.22
“Prorat;
'
fon of
|
Charges to units