wane one
SFO.43 4
(3. 50}
SHEEY wo. 2? of68
COMPLETION REPORT FOR
4S-BUILT DRAWING NUMBERS ANDO DATES:
wien
nero
23-335
11/16/50
28-184
ho.
ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE
JOB NO. 640
CONTRACT NO.
For:
11/16/50
aT-( 29-11-507
LOCATION
PARRY ISLAND - SITE "Bb"
The Complete Construction of Maintenance Warehouse
Buildin g
:
No.:
323
»
cCSTIMAT
28-429 11/16/50
STIMATE
"Property
Account
Page 104
"Not for use by Af
DATE OF THIS REPORT:
*
14 November 1950
DESCRIPTION OF PROPERTY UNITS
Quantity
Unit
Constructlon
Contract
Est'd, Vaiue
Goveparal shed |
Engineering
Cost
T
otal
MAINTENANCE WAREHOUSE
This is a one story twin gable (parallel), single roofed, prefabricated alusinua
building, erected on a concrete slab, sise 51'=2" x 101'~10 1/2", complete with
electrical wiring and fixtures, telephone installationa, fresh and salt water
plumbing, alumirum partitions and four sliding doors. The size I.D. is 50'-O"
wide x 100'-8 1/2" long x 10'-O" mean height, with a cubic content of 19,950
cubic feet, and a floor area of 5,212 square feet.
This building includes the following equipment:
and one water cooler with drinking fountain.
One issue counter with shelves,
1
Each
Direct
Indirect
$2h, 351.25
6,975 92
BR
$818.00
$32,145.17
*Prorati
Charges on
to ofUnits