o
yd
a
ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE
SFO. 430
(8. 50)
AS-BUILT DRAWING NUMBERS AND DATES:
2B-1i,
11/18/50
2B+163
11/18/50
2B~334
2B-427)=—
188-1801
11/18/50
11/18/50
11/21/50
“Property
Account
Number
SHEET MO.
COMPLETION REPORT FOR
JOB NO. 640 - ld
CONTRACT NO.
For:.
_AT-—( 29-11-50?
LOCATION PARRY ISLAND - SITE "B®"
68
21 November 1950
ESTIMATE
unit
Construction
Cont ract
ost
Est'd. Value
Gov. Furnishea}
Material
§&"9 {neering
Total
.
Choracs tounits
MATERIALS TESTING LABORATORY
This is a one story, double roofed, prefabricated alusinus building, erected on a
concrete foundation, size 25'-2" x 2$'-10 1/2", which includes a foundation pit
for a 300,000# Universal Teating Machine, complete with electrical wiring and
fixtures, telephone, and fresh water plumbing. The size I.D. ia 24'-0" x 2h'8 1/2" x 10'-0" mean height, with a cubic content of 5,930 cubic feet and a floor
area of 651 square feet.
This building contains the following equipment: One testing machine, one bench,
one counter, four tanks, one sink, one hot plate, and a fire extinguisher;
the
furniture includes: One table, one chair, and one typewriter.
1
°
DATE OF THIS REPORT:
i
Materials
Testing Laboratory
Bullding No.: 309
Quantity
OF
@ P
100
"Not for use by A-E -
The Complete Construction of
DESCRIPTION OF PROPERTY UNITS
LO
Each
Direct
Indirect
$17,353.68
3,323.75
$255.57
-
$20,933.30
TIQN
tne inf,
tion affecting
of the United Staten Ite
aur
o@ts contents
newt
tin
bbe
person is
criminal
Law.”