, ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE
SFO-.43 0
(3. 50}
SHEET NO.
COMPLETION REPORT FOR
AS-BUILT DRAWING NUMBERS AND DATES:
2h-5117
3/24/52
24-06
3A9/51
JOB NO,
640 = 2f-2
640
Cu)
24-2
For :
=- 2g-2
CONTRACT NO,
AT-( 29-1)-507
Construction
n
ic.
n
The e C. Complete
lete Constructi
Building No.:
38
oF
4
"Not for use by A-E
LOCATION
of
ENIWETOK ISLAND ~ SITE "a"
DATE OF THIS REPORT:
ents
6 Man Tent
24 March 1952
201 thru 439
ESTIMATE
woo
“Property
wo
Account
DESCRIPTION OF PROPERTY UNITS
Quantity
i
rt
Unit
—
Construction
Contract
—~
Est'd.
Value
Gov. furcished
Engineering
*Proration of
Cost
Charges to Units
6 MAN TENTS
An eight-man tent and wood frame anchor bolted to a |" thick concrete slab, size
O-D. 15'=10" x 31'-10", slab area SO square feet, complete with electric wiring
and fixtures.
*
239
1
Each
Unit
Direct
Indirect
TOTAL = 239 Unite
~
Direct
679.51
20.56
$6.90
$162,103.72
%,.
“Tin
the ar.
tar Biastn
in it
prone.
pera
os