13-50}
JOB NO. 640 - 2p
640 = 2q
7th Engineer Brigade Drawings
Shts. 1 thru 16 = 1/17/51
98-601 4/21/51
9a-525 3/19/51
24-637
"Property
-
COMPLETION REPORT FOR
AS-BUILT DRAWING NUMBERS AND DATES:
2a-¥d2
2h 7
ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE
‘
SFO-43 0
3/19/51
3/19/51
309/51
CONTRACT NO,
For:
for use by A-E
DATE GF THIS REPORT:
21 april 1951
121, 12h,
ESTIMATE
Quantity
DESCRIPTION OF PROPERTY UNITS
Account
Numoer
"Not
The Complete Construction of Freah and Salt Water Systems, Elevated Water
To r, Salt Water Pump Station, and Acid Tank Bldg.
Bullding No.:
FS-173 4/19/51
LOCATION ENIWETOK ISLAND - SITE "a"
AT-( 29-1 }-507
SHEET NO. _3Q__oF }y
Unit
Construction
Contract
Cost
Est'd. Value
Gov. Furnished
Material!
~T
Enginee ring
Cost
Total
*Proration of
Charges to Units
FRESH WATER SYSTEM
Consists mainly of 3", )" and 6" transite pressure pipe, 2'-6" usferground, valves,
fittings and services to the extent of 22,565 lineal feet of mains, 1 fire hydrant
and 67 service connections.
System
Direct
Indirect
$33,631.60
8 O09 .27
$2,535+h5
$l, 216.32
Direct
Indirect
- $33,139.64
79931653
$2,573.10
$43, 6h4.27
Lot
Direct
Indirect
$197,901.00
25, 503-9k
Direct
Indirect
$261, 672624
1 ,4Sh.7h
SALT WATER SYSTEM
Consists mainly of 4" and 6" transite presaure pipe, 2'-6" underground, valves,
fittings and services to the extent of 22,900 lineal feet of mains, 22 fire
hydrants and 66 service connections,
Syston
ELEVATED WATER TOWER - Bldg. #121
This structure consists of one salt water storage tank (1,000 barrel capacity),
ons fresh water storage tank (500 barrel capacity), both same dianeter, mounted
on a structural steel and wood platform, size 27'-0" x 52'~0" with 3'-6" handrail
all around, elevated 50 feet above grade by ten 12" x 12" spliced wood columns,
vertically and horisontally criss cross braced, four benta high by four bents
wide, with 3/" diemeter tie rods, concrete foundation piers with anchor bolts
supporting the ten columns, fixed wood ladders reach from grade to intermediate
and top platforms. The structure, including tanks with steel ladders, is painted
and complete with pipe, fittings and aircraft warning light.
Cost of thie item is included in the Fresh and Salt Water Systens.
WATER DISTILLATION EQUIPMENT
kquipment includes:
ight 600 G.P.H. distillation units, piping, pumps, tanks,
and chemical feeder, all located in Building #56, and eight distillation units in
Building #S6a.
TOTAL - Systems & Equipment
$223, LO04.9h
$5,108.55
$311,265.53
SALT WATER PUMP STATION - Bldg. #12)
A one story, double roof, prefabricated aluminum building, erected on a 5" thick
concrete floor slab with s drain trench and concrete masses for equipment founda
tions and pipe supports, size 0.0. 25'~2" x 33'=10 1/2", total 853 square feet,
Continued on Next Page