ATOMIC ENERGY COMMISSION * SANTA FE OPERATIONS OFFICE oe eeees COMPLETION REPORT FOR As HUILT DRAWING NUMBERS ANG DATES: 2a-964 2/12/51 2a-019 - 1/12/51) nIrest Laie SK-lLO «4/19/52 11A-09 1218-b70 - 3/19/52 3/19/52 eae Laie LA-4650/LL/S2 JOK NO, 64O = 2 Lo{1) 1A-466 0/14/51 LaA=5h09)— 4/14/51 / CONTRACT NO, 640 ~ 2 1-(2) oO - 2-2) For. | Account i me OF ; PROPERTY UNITS Number LOCATION “Net ENIWETOK ISLAND - SITE "A" P.O.L. Facilities ep . Quantity | , for use by A-f DATE GF THES REPORT 19 April 195) Gh, 95, 95A, 96, 96A, 1d0, 181, and 183 CSTIMATE Building Now: oneeoe-3 etn a-543— 1/11/51 DESCRIPTION AT-1 29-11-507 The Complete Canstruction of MayesViaee |broperty . i) Unit foe ee OiCe Construction tst'd. Value nai *brorat . . Contract BON . poral shed ngineering cast ateria Cast aa roe pe - I ! P.deLs FACILITIES The P.O.L. Facilities; within a 6' chain link and barbed wire fence enclosure, | | approximately 260' wide by 520' long, having one 12' gate and two 3' gates and @# system of stabilized dikes, include the following: | 100 OCTANE AVIATION GASOLINE STORAGE - Bldg.#95 - Dwg. 114-68 - 1/11/51 | ! Steel Tank; vertical bolted type, 1,000 barrel capacity; equipped with manhole, Ladder, vent valve, liquid level indicator. Tank ia erected on 10" thick reinforced concrete pad, having an area of 1,772 square feet. This unit includes all piping and connections to P.J.L. system, as well as a compacted earth dike @nacircling the tank. 4 Each 1 Each i Each MOGAS & 91 OCTANE AVGAS STORAGE % PIPING - Bldg. #95 - 11A-l69 - 3/19/51 One 42,000 gallon mogas steel cylinder tank vertically mounted on a reinforced concrete foundation 23'-O" octagonal x 10" thick (13.5 cubic yards) and four 10,000 gallon steel cylinder tanxs horizontally mounted on concrete piers 3' above grade, two each 3 and 4 inch piping systems are included in the installation. | DIESEL VIL STURAUE & PIPING - Bldg. #964 - L1A-h70 ~ 3/19/51 One 42,000 gallon mogas steel cylinder tank vertically mounted on a reinforced concrete foundation 23'-O" octagonal x 10" thick (13.5 cubic yards) and four 10,000 gallon steel cylinder tanks horizontally mounted on concrete piers 3! above grade, one each 3 and inch piping systems are included in the installation. JP-1 FUEL STORAGE = Bldgs #96 - 114-47) - 1/11/51 One steel tank, bolted, vertical, 1,000 barrel capacity; set on a 10" thick reinforced concrete foundation pad; canplete with manhole, ladder, vent valve, liquid level indicator, and pertinent piping, fittings and valves; compacted fil) dike around tank area. a Slab area 0.3. lid square feet. 1 Each WATER FOG FIRt PROPECTION SYSTEM - 124-5412 thru 11a-5),09 - 4/1b/52 on | This is an underground piping system supplying four wharf type hydrants and one stand-pipe. Supply is from a 4" salt water main. 1 — | \@h Each wa Continued on Next Page —— ~ P al~ _ . a ron Charges toe last: Total soe”

Select target paragraph3