ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE
SFO- 430
(3.50)
sHeer no, 25 or4h.
COMPLETION REPORT FOR
AS-HUILT ORAWING NUMBERS AND DATES:
2a-S112
24-5126
1/L/51
3/19/51
24-054
3/19/51
2h-512h
JOB NO.
640 = 25
CONTRACT
For:
3/19/52
NO.
:
Account
DESCRIPTION OF PROPERTY UNITS
Number
BNIWETOX ISLAND - SITE "a"
"Not
for
OATE
OF
7
.
?
93
__
Unit
by
Contract
Cost
Gov. Furnished]
Material
-
togineering
Cost
lotal
$846.42
$27,191.70
L-13 OPERATIONS BUILDING - Bldg. #92
One story, double roof, prefabricated aluminus construction; rectangular shape;
size I.D. 2h'-0" x 32'-8 1/2" x 10'-0" mean height; set on a 5" thick concrete
slab; vented window panels; with electrical wiring and fixtures; floor area
0.D. 855 square feet; cubic content 7,850 cubic feet,
1
Each
Direct
$7,166.38
| Mel3 MAINTENANCE BULLDING - Bldg. #93
This is a one story building with steel frame and corrugated alumimim siding and
roofing, size 0.0. SO'-0" x 60'-6" x 15'-O" high, erected on a 5" reinforced
concrete slab.
Total floor area 0.D. 3,025 aquare feet, complete with electrical
wiring and fixtures.
attached to building.
A 5" thick reinforced concrete slab, 24'-0" x 50'-0", is
The installed equipment includes:
A bench type grinder.
1
Each
Direct
Indirect
A-E
ESTIMATE
yo teencan] Est'd. Value]
Quantity
use
THIS REPORT:
1? March 1951
The Complete Construction of Leal} Operations building and L-13
oa:
Maintenance Building
Bu tid
No.:
92 and
vee
“Property |
LOCATION
AT-( 29-1)-507
$25, 354.7
990.54
"rroration
Charges
of
to units