ATOMIC ENERGY COMMISSION
SANTA’ FE OPERATIONS OFFICE
SFO. 43 0
(3. 50}
COMPLETION REPORT FOR
JOB NO.
AS-BUILT DRAWING NUMBERS AND DATES:
-'
2a-5109
640 = 23
1/L,/51
CONTRACT NO.
For:
AT~( 29-1 )-507
"Not
ENIWETOK ISLAND - SITE "4"
The Complete Construction of Crash Truck Shelter Building
Building Now:
2
for use by A-E
DATE OF THIS REPORT:
i
Jamary 1951
ESTIMATE
“Property
DESCRIPTION OF PROPERTY UNITS
Quantity
Unit
Constructlon
Contract
Est'd. Value
F
{ pned
COM ena
Engi neeri
e
ng
Cost
_
Total
CRASH TRUCK SHELTER BUILDING
One story, double roof, prefabricated aluminum construction; rectangular shape;
sise 1.D. 24'=-0" x 20'-8 1/2" x 10'-O" mean height; anchor bolted to a 5" thick
reinforced concrete slab; vented window panels; benches; electrical wiring and
fixtures; floor area 0.D. 550 equare feet; cubic contents I.D. 4,970 cubic feat.
ordh
91
a
coun
———
LOCATION
SHEET NO.
1
Each
Direct
Indirect
$4,609.95
180.10
$153.90
$4,943.95
_
"Prorat
f
Chargestonto go Unite