COMPLETION REPORT FOR
DRAWING NUMBERS AND DATES:
2a-5105
JOB NO.
3/19/51
2a-985
3/19/51
24-033
3/19/51
640 - 23
DATE OF THIS REPORT:
19 March 1951
The complete Construction of Air Foree Drone Group Headquarters
Buiiding Now:
*,
"Not for use by A-E
LOCATION ENIWETOK ISLAND = SITE "a"
CONTRACT NO, AT~( 29-11-50?
For:
.
sHeet nO. 39 or
ey
a
(7
ESTIMATE
“property|
Account
Number
-
-
DESCRIPTION OF PROPERTY UNITS
OT
to
Quantity
“nit
LL 4 _.
Construction
Contract
Cost
Os
Est'd.
Gov.
Value
Furnisned
Material
a er a
~
Engineering
cast
--
“Proration of
Charges to Unite
—
AIR FORCE DRONE GROUP HEADQUARTERS
This is a one story, double roof, prefabricated aluminum building, aise I.D.
2h'~O" x 80'=8 1/2" x 10'-0" mean height, erected on a 5" thick concrete slab.
Complete with electric wiring and fixtures and talephone installation. Floor
area 0.D. 2,061 square feet.
1
Each
Direct
Indirect
$17,274.75
671-88
$576.69
$18,526.32