ATOMIC ENERGY COMMISSION SANTA FE OPERATIONS OFFICE SFO-a@]4 AS-BUILT eel eA (3. $0) COMPLETION REPORT FOR DRAWING NUMBERS AND DATES: 2a-5105 JOB NO. 3/19/51 2a-985 3/19/51 24-033 3/19/51 640 - 23 DATE OF THIS REPORT: 19 March 1951 The complete Construction of Air Foree Drone Group Headquarters Buiiding Now: *, "Not for use by A-E LOCATION ENIWETOK ISLAND = SITE "a" CONTRACT NO, AT~( 29-11-50? For: . sHeet nO. 39 or ey a (7 ESTIMATE “property| Account Number - - DESCRIPTION OF PROPERTY UNITS OT to Quantity “nit LL 4 _. Construction Contract Cost Os Est'd. Gov. Value Furnisned Material a er a ~ Engineering cast -- “Proration of Charges to Unite — AIR FORCE DRONE GROUP HEADQUARTERS This is a one story, double roof, prefabricated aluminum building, aise I.D. 2h'~O" x 80'=8 1/2" x 10'-0" mean height, erected on a 5" thick concrete slab. Complete with electric wiring and fixtures and talephone installation. Floor area 0.D. 2,061 square feet. 1 Each Direct Indirect $17,274.75 671-88 $576.69 $18,526.32